Our Main Products
Standardized Design
Optimize workflow through truly constructible design, detail and information management.

High-rise building-shear wall structural system
Forest City project has completed 290,000 M2, 40 floors, 120 meters high-rise.

Villa / Terrace House wall panel structure system
150,000 M2 of completed projects.

Carpark / Commercial frame structure system
150,000 M2 of Forest City project and 8,000 M2 of Singapore project have been completed.

Singapore HDB,
PBU, PPVC
Expand Malaysia and Singapore projects.
TEKLA & ERP
Achieve full life cycle BIM management

One Mould, One Code, One BOM

One Product One Code
Data Command Center

ERP System
Command Multiple Systems

Material Preparation System

Production System

Logistic System

On-site Lifting System
Fully Automation Production Line
Optimize workflow through truly constructible design, detail and information management.

Carousel Line

Shuttering & Deshuttering Robot

Deshuttering Robotic Arm

Shuttering & Plotting Robotic Arm

Pallet Cleaning Machine

Shuttering Cleaning Machine

Shutter Storing System

Shutter Storing System

Concrete Spreader
Automatically pour concrete according to the data from ERPBOS.

Compacting Equipment
Vibrate the pallet to compact the fresh concrete.

Curing Chamber
For optimum use of the hall space. Pallets are stored on top of the one another on the pallets racks.
Logistic
Transport route is fixed, and rational. It is better to control the transport cost.

Stockyard Layout Optimization & Rational
- Clear job division
- Receiving qualified products
- Direct loading in rack
- Bar code scanning
- Equipment maintained
- Stockyard worker management
- Receiving qualified products
- Direct loading in rack
- Bar code scanning
- Equipment maintained
- Stockyard worker management



CIBS managed all the PC truck by CARTRACK system.
We can effectively manage the Location, Route, Speed, Fuel Consumption, behavior etc.
We can effectively manage the Location, Route, Speed, Fuel Consumption, behavior etc.