Our Main Products

Standardized Design

Optimize workflow through truly constructible design, detail and information management.
Image

High-rise building-shear wall structural system

Forest City project has completed 290,000 M2, 40 floors, 120 meters high-rise.
Image

Villa / Terrace House wall panel structure system

150,000 M2 of completed projects.
Image

Carpark / Commercial frame structure system

150,000 M2 of Forest City project and 8,000 M2 of Singapore project have been completed.
Image

Singapore HDB,
PBU, PPVC

Expand Malaysia and Singapore projects.

TEKLA & ERP

Achieve full life cycle BIM management
Image

One Mould, One Code, One BOM

Image

One Product One Code

Data Command Center

Image

ERP System

Command Multiple Systems

Image

Material Preparation System

Image

Production System

Image

Logistic System

Image

On-site Lifting System

Fully Automation Production Line

Optimize workflow through truly constructible design, detail and information management.
Image

Carousel Line

Image

Concrete Spreader

Automatically pour concrete according to the data from ERPBOS.
Image

Compacting Equipment

Vibrate the pallet to compact the fresh concrete.
Image

Curing Chamber

For optimum use of the hall space. Pallets are stored on top of the one another on the pallets racks.

Logistic

Transport route is fixed, and rational. It is better to control the transport cost.
Image

Stockyard Layout Optimization & Rational

- Clear job division
- Receiving qualified products
- Direct loading in rack
- Bar code scanning
- Equipment maintained
- Stockyard worker management
Image
Image
Image
CIBS managed all the PC truck by CARTRACK system.

We can effectively manage the Location, Route, Speed, Fuel Consumption, behavior etc.